document

Proposal for General Application of DCC Requirements for Ireland

The consultation on the parameters for the Demand Connection Code [DCC] has now closed. This proposal document is produced by ESB Networks in their role as the Distribution System Operator in Ireland.  This document contains the proposed parameters and explanations as to the reasons for their adoption, which are now formally submitted to the Commission for Regulation of Utilities [CRU] for approval.  It also contains responses to the consultation.

Download PDF | 855 KB

Letter to Silage Contractors - May 2019

This letter identifies the risk associated with coming close to live electricity wires. Very serious electrical accidents have taken place involving silage machinery.

Letter to Silage Contractors | Download pdf

document

Apprenticeship pdf

This pdf contains information about entry requirements for an Electrical/Network Technician Apprenticeship in ESB Networks . It also has details on interview tips and how to apply.

Download pdf | 1 MB

document

Connection Policy - Transitional Arrangements Capacity Release - Results

In line with the commission for Energy Regulation (CER)'s Decision Paper - Connection Policy Transitional Arrangements CER/16/284, and as amended by Connection Policy Transitional Arrangements Partial Capacity Release CER/17/090, generation customers were given the opportunity to  apply to ESB Networks to terminate all or part of an eligible Customer's Distribution Connection Agreement.

The deadline for application was 30th June 2017. 

As directed in CER/16/284, we are now publishing the results in relation to the Distribution Capacity Release applications received.

 Download PDF | 216KB

Please see EirGrids website (Link) for details on the Transmission Capacity Release results.

beckett_bridge_sml (002)

ESB Networks Performance Report 2015

The report covers the performance of ESB Networks’ Business for the year ending December 2015

Download PDF | 1MB 

Public Safety Strategy 2017 - 2020  86x125

Public Safety Strategy 2017-2020

Public Safety Strategy and Action Plan 2017-2020.  Educating the public to act safely near electricity.  Download PDF | 2MB

How you can avoid hitting electricty cables 86x125

How you can avoid hitting electrical cables when digging and drilling

This booklet provides guidelines that apply to all work that involves penetrating the ground at or below surface level where there maybe ESB Networks cables or privately owned cables.

Download PDF | 395 KB

Safe Construction with Electricity

This booklet provides important safety and customer service information to help you stay safe when working near electricity networks and to explain key steps when you require services from ESB Networks. 

Download PDF

document

DSO completed Applications list 31.08.2017 Excel Spreadsheet

DSO Completed Applications list 31.08.2017