Publications

All Publications

286 KB

Consultation on proposed direction on data centres (CRU21060)_ESBN response submitted to CRU 07.07.2021

Download PDF

3 MB

ESB Networks Annual Performance Report 2018

The report covers the performance of ESB Networks’ Distribution Business for the year ending December 2018.

Download PDF

475 KB

Joint Transmission Asset Owner and Transmission System Operator PR5 Consultation

ESB Networks and EirGrid in their respective capacities as Transmission Asset Owner (TAO) and Transmission System Operator (TSO) respectively, are today publishing a consultation on enhancing the collaboration between the TSO and the TAO with regards to project delivery. This is aligned with Section 7.9 of the CRU’s PR5 Regulatory Framework Incentives and Reporting (CRU/20/154) determination.

This public consultation is intended to seek customers, industry participants and other interested parties views on the approach to achieving the objectives of this incentive.

Consultation Question

The purpose of the PR5 TSO/TAO joint incentive is to promote efficiencies through enhanced collaboration in network project delivery. Do you have comments on the collaboration activities proposed to achieve this aim as part of the TSO/TAO joint multi-year balanced scorecard for 2023-2027?

Next Steps

The consultation period will run for six weeks, beginning on 1st December 2022, and closing on 13th January 2023 at 17:30pm.

Interested stakeholder’s views are invited and can be sent to consultations@esbnetworks.ie, or the EirGrid consultation portal.

The TAO and TSO will consider the consider the feedback received within the scope of this consultation and will prepare and publish a consultation response document. Respondents who wish to have their responses remain confidential should clearly note this in their response.

Download PDF

143 KB

Modification Proposal #58 - Permanent Decommissioning of Generation Units, and the introduction of the term Power Generation Facility Owner (PGFO) in DOC12

CRU has approved Modification No. 58 of the Distribution Code, caters for the permanent decommissioning of generation Units, and introduces the term Power Generation Facility Owner (PGFO ) in DOC12.

Effective Date 08/10/2021.
Download PDF

240 KB

Scope of Data Exchange for KORRR V2

Download PDF

178 KB

Basis of Charges for Connection to the Distribution System

This document sets out the basis on which charges for connection to the Distribution System are calculated and applied by ESB Networks DAC. in its role as the Distribution System Operator.

Download PDF

2 MB

ESB Networks 2017 Performance Report

The report covers the performance of ESB Networks’ Business for the year ending December 2017.

Download PDF

281 KB

ESB Networks Response to CRU Consultation on Offshore Connection Policy – Phase 1 Projects (CRU/2022/51)

Download PDF

204 KB

ESBN Response to CRU20169 CRU Call for Evidence on Smart PAYG 29.01.2021

Download PDF

105 KB

Manufacturer’s ELS Product Declaration NC7-03-R1

ESB Networks DAC requires the information requested on this form to manage your electricity supply connection. As the Distribution System Operator, this information is also required to enable ESB Networks DAC to manage the electricity network.
Download PDF

89 KB

Modification Proposal #57 - Housekeeping and correction of text to reflect the use of a DSO RTU to give effect to Controllability requirements per Mod#36

CRU has approved Modification No. 57 of the Distribution Code, corrects text to reflect the use of a DSO RTU to give effect to Controllability requirements per Mod#36.

Effective Date 11/05/2022.
Download PDF

160 KB

Test Form for Export Limiting Scheme (ELS) (NC7-02-R2)

ESB Networks DAC requires the information requested on the Test Form For Export Limiting Scheme to manage your electricity supply connection. As the Distribution System Operator, this information is also required to enable ESB Networks DAC to manage the electricity network.
Download PDF
4 / 51
3 4 5
. . .
49 50 51