Publications
All Publications
286 KB
Consultation on proposed direction on data centres (CRU21060)_ESBN response submitted to CRU 07.07.2021
Download PDF3 MB
ESB Networks Annual Performance Report 2018
The report covers the performance of ESB Networks’ Distribution Business for the year ending December 2018.
475 KB
Joint Transmission Asset Owner and Transmission System Operator PR5 Consultation
ESB Networks and EirGrid in their respective capacities as Transmission Asset Owner (TAO) and Transmission System Operator (TSO) respectively, are today publishing a consultation on enhancing the collaboration between the TSO and the TAO with regards to project delivery. This is aligned with Section 7.9 of the CRU’s PR5 Regulatory Framework Incentives and Reporting (CRU/20/154) determination.
This public consultation is intended to seek customers, industry participants and other interested parties views on the approach to achieving the objectives of this incentive.
Consultation Question
The purpose of the PR5 TSO/TAO joint incentive is to promote efficiencies through enhanced collaboration in network project delivery. Do you have comments on the collaboration activities proposed to achieve this aim as part of the TSO/TAO joint multi-year balanced scorecard for 2023-2027?
Next Steps
The consultation period will run for six weeks, beginning on 1st December 2022, and closing on 13th January 2023 at 17:30pm.
Interested stakeholder’s views are invited and can be sent to consultations@esbnetworks.ie, or the EirGrid consultation portal.
The TAO and TSO will consider the consider the feedback received within the scope of this consultation and will prepare and publish a consultation response document. Respondents who wish to have their responses remain confidential should clearly note this in their response.
143 KB
Modification Proposal #58 - Permanent Decommissioning of Generation Units, and the introduction of the term Power Generation Facility Owner (PGFO) in DOC12
Effective Date 08/10/2021.
178 KB
Basis of Charges for Connection to the Distribution System
This document sets out the basis on which charges for connection to the Distribution System are calculated and applied by ESB Networks DAC. in its role as the Distribution System Operator.
2 MB
ESB Networks 2017 Performance Report
The report covers the performance of ESB Networks’ Business for the year ending December 2017.
281 KB
ESB Networks Response to CRU Consultation on Offshore Connection Policy – Phase 1 Projects (CRU/2022/51)
Download PDF105 KB
Manufacturer’s ELS Product Declaration NC7-03-R1
89 KB
Modification Proposal #57 - Housekeeping and correction of text to reflect the use of a DSO RTU to give effect to Controllability requirements per Mod#36
Effective Date 11/05/2022.
160 KB
Test Form for Export Limiting Scheme (ELS) (NC7-02-R2)