Publications
All Publications
1 MB
Conditions Governing the Connection and Operation of Export Limiting Schemes (ELS) at LV and MV
This document is to facilitate the installation of generation at demand sites within the scope of Mini-Generation and Small Scale Generation, as defined in the "Conditions Governing the Connection and Operation of Mini-Generation" and the "Conditions Governing the Connection and Operation of Small Scale Generation".
97 KB
Distribution Loss Adjustment Factors
This document contains a table listing the current Distribution Loss Adjustment Factors.
924 KB
ESB Networks response to CRU Call for Evidence on the Electricity Tariff Structure Review (CRU/21/123)
Download PDF46 KB
Modification Proposal #56 - Inclusion of RCES for Topology 4-5
Effective Date 11/05/2022.
1 MB
ESB Networks Performance Report 2015
The report covers the performance of ESB Networks’ Business for the year ending December 2015
72 KB
Modification Proposal #55 - Housekeeping and correction to Figure 20 FRT graph
CRU has approved Modification No. 55 of the Distribution Code, corrects an inaccuracy in figure 20.
Effective Date 11/05/2022.
816 KB
ESB Networks Performance Report 2014
The report covers the performance of ESB Networks’ Business for the year ending December 2014
235 KB
Modification Proposal #54 - Housekeeping and correction of transcription errors relating to Reactive Power requirements
CRU has approved Modification No. 54 of the Distribution Code, which was introduced to make corrections to the Distribution Code regarding Reactive Power requirements.
Effective Date 11/05/2022.
125 KB
Rules for Application of Transactional Charges for Additional Services to Use of System
On an annual basis, CER approves these charges to apply for services carried out on foot of special requests made by Suppliers. This document outlines the rules for applying such charges.