Skip to Content
For emergencies: Call 1800 372 999
Gaeilge

FOI Disclosure Logs

FOI10320

Status Refused
Date received 25 Jun 2021
Date of decision 21 Jul 2021
Category of requester Business / Interest Group
Details of request

A breakdown on a locality and district basis of the PSO levies since their introduction. If there is list giving the distribution districts this used a three-digit numerical identifier which was based on 10kV distribution districts.

FOI110317

Status Handled Outside FOI/Withdrawn
Date received 06 May 2021
Date of decision 20 May 2021
Category of requester Business / Interest Group
Details of request

The number of each type of residential meter in the Republic of Ireland; MCC01, MCC02, MCC51, MCC12, MCC16. Etc.

FOI110314

Status Part-Granted
Date received 02 Apr 2021
Date of decision 20 Apr 2021
Category of requester Client
Details of request
All communication between ESB Networks and Irish Rail or consultancy firms such as Arup appointed by Irish Rail regarding electrification of the railway between Malahide and Drogheda as part of the DART+ project between 01/01/21 and present day. 

FOI103310

Status Refused
Date received 29 Mar 2021
Date of decision 20 Apr 2021
Category of requester Journalist
Details of request

All details, letters, emails and other correspondence from third parties acting on behalf of EirGrid from ESB/ESB Networks regarding the North South Interconnector to the Department of Communication, Climate Action and Environment, on or after 1 January 2015. 

All details, letters, emails and other correspondence from third parties acting on behalf of EirGrid from ESB/ESB Networks regarding the North South Interconnector to Cavan/Monaghan/Meath County Councils, on or after 1 January 2015. 

Records prepared or considered by Department on or after 1 January 2015 in relation to the alteration, diversion or undergrounding of the North-South Interconnector 

Records sent by EirGrid to the Department Networks on or after 1 January 2015 in relation to the alteration, diversion or undergrounding of the North-South Interconnector. 

FOI10311

Status Part-Granted
Date received 24 Mar 2021
Date of decision 20 Apr 2021
Category of requester Journalist
Details of request

Details of all complaints and any actions taken by the ESB after complaints to ESB Networks made by residents of Longford and in tabular form between March 1st 2020 and March 1st 2021.  

Details of all complaints and any actions taken by the ESB after complaints to ESB Networks made by residents of Roscommon and in tabular form between March 1st 2020 and March 1st 2021  

Details of all complaints and any actions taken by the ESB after complaints to ESB Networks made by residents of Leitrim and in tabular form between March 1st 2020 and March 1st 2021

FOI10309

Status Part-Granted
Date received 05 Mar 2021
Date of decision 23 Mar 2021
Category of requester Client
Details of request

The cost of producing for the publication titled: 

"Housing Schemes: Guidebook for ESB Networks Standards for Electrical Services Revision 5 January 2014"

FOI10299

Status Refused
Date received 25 Feb 2021
Date of decision 28 Feb 2021
Category of requester Business / Interest Group
Details of request

1. Records of the procurement process for steelwork/pylon designs for the north south interconnector project including but not limited to: 

(i) a copy of the procurement documentation issued: 

(ii)  a copy of all steelwork/pylon designs considered for use on the the north south interconnector project; (iii)a copy of the decision to award the contract/framework agreement/tender under the procurement process for steelwork/pylon design for the north south interconnector including the minutes of the meeting where the decision was made: 

(iv) a copy of the contract/framework agreement/tender awarded under the procurement process: 

(v) a copy of the steelwork/pylon designs and specifications which have been approved for the north south interconnector project. 

(iv) a copy of any orders placed under the contract/framework agreement/tender. 

2. Records of the procurement process for the supply of steelwork/pylons for the north south interconnector project including but not limited to:  

(i) a copy of the procurement documentation issued: 

(ii) a copy of the contract/framework agreement/winning tender for the supply of steelwork/pylons for the north south interconnector: 

(iii) a copy of the decision to award the contract/framework agreement/tender under the procurement process for the supply of steelwork/pylon for the north south interconnector including the minutes of the meeting where the decision was made: 

(iv) a copy of any orders placed under the contract/framework agreement/tender. 

3. Records of any other framework agreements/contracts/tenders awarded for the supply of materials and/or the carrying out of works on the north south interconnector project including but not limited to a copy of the contract/framework agreement/contract. 

FOI10304

Status Refused
Date received 12 Feb 2021
Date of decision 02 Mar 2021
Category of requester Client
Details of request
Location details within Ireland where dwellings have been built adjacent (within 5M) to a substation.

FOI10302

Status Refused
Date received 06 Feb 2021
Date of decision 02 Mar 2021
Category of requester Client
Details of request
Details of the salary grades used for staff employed in Health & Safety Management roles.

FOI10301

Status Refused
Date received 01 Feb 2021
Date of decision 04 Feb 2021
Category of requester Journalist
Details of request
  1. The cost (broken down by year) of the maintenance of the Poolbeg chimney stacks by ESB Networks, for each year from 2015 to 2020. 
  2. A breakdown in any other costs related to the Poolbeg chimney stacks, broken down by each year from 2015 to 2020