FOI Disclosure log
FOI Requests received by ESB Networks DAC's FOI Office from 2020 to Q2 2024
Table 1 - FOI Disclosure Log
Date Received | Category of Requester | Description of Request | Status | Date of Decision | Id Number |
---|---|---|---|---|---|
28/05/2024 | Client | I would like to obtain the following documents: 1. A copy of the ESB's complaints procedure. 2. Any written instructions or procedures that employees use to book jobs. 3. Any written instructions or procedures that employees use to book jobs using contractors. 4. A copy of any procedures that the Tuam office may use that differ from the mainstream procedures. | Part-Granted | 14/06/2024 | FOI00751 |
27/05/2024 | Client | In accordance with Section 12 of the Freedom of Information Act 2014, I now request access to the following records concerning ESB Network Limited’s functions under its Distribution System Operator Licence listed in the Appendix in the referenced DPIA: •Document 1 Definitions •Document 2 Risk Rating Criteria •Document 4 List of ESM Events. | Part-Granted | 24/06/2024 | FOI00750 |
20/05/2024 | Oireachtas | I would be grateful to receive update on the roll out Fibre Optic in Mitchelstown carried out by ESB network and the time frame around it for Mitchelstown. | Refused | 14/06/2024 | FOI00748 |
15/05/2024 | Journalist | Any cost estimations or the amount of funding set aside for repair and repainting works for the Poolbeg Chimneys in 2024 and 2025. Would it also be possible to get the amount being spent on current investigation/assessment works. | Refused | 17/05/2024 | FOI00746 |
30/04/2024 | Business/ Interest Group | A map of the overhead power lines in Askeaton, co. Limerick to support work we have in that town. | Handled outside FOI | 09/05/2024 | FOI00741 |
24/04/2024 | Business/ Interest Group | I recently visited your webpage at who-we-are-our-networks and noted the detailed information on the various cables and substations that you manage. We are interested in understanding how frequently the data on your networks is updated and whether this information is available in any geographic data formats such as GeoJSON or SHP. Having access to such data in these formats would be incredibly beneficial for integrating it into our platform, thereby enhancing our services. Could you provide details regarding the update rate of your network data and the availability of any geometric formats? | Withdrawn | 08/05/2024 | FOI00736 |
22/04/2024 | Client | 1. How many commercial/business accounts have had their meter readings units reduced/went back by as much as 30,000 - 60,000 units for no apparent reason in the last three years? | Refused | 08/05/2024 | FOI00734 |
22/04/2024 | Client | Communication between the ESB and Limerick County Council and/or Monaleen GAA club in relation to the movement of power lines and development work as per local authority planning applications 23336 and planning application 211636. Records/notes of any meetings that took place between EBS and Limerick County Council and/or Monaleen GAA club in relation to planning application 23336 and 211636. | Part-Granted | 25/04/2024 | FOI00735 |
11/04/2024 | Client | 1. Records of the schedule of all planned network maintenance works that were to be carried out in the vicinity of Cloone village, Co. Leitrim between January 8th 2024 and January 12th 2024. For identification of the records, the works would have been scheduled to take place between the above dates, this is not the actual date of the record itself. 2. Records of all actual maintenance or repair works to the network, both planned and un-planned, carried out in the vicinity of Cloone village, Co. Leitrim between January 8th 2024 and January 12th 2024. 3. Records of work logs including maintenance logs, diary entries or emails for all staff relating to work carried out in the vicinity of Cloone village, Co. Leitrim between January 8th 2024 and January 12th 2024. 4.Records of any non-standard power overloads, power surges, safety alerts/triggers that occurred on the ESB network for supply to Cloone village, Co. Leitrim between January 8th 2024 and January 12th 2024. 5.Records of any equipment purchases or equipment replacements made on the network in the vicinity of Cloone village, Co. Leitrim between January 8th 2024 and January 12th 2024. | Part-Granted | 03/05/2024 | FOI00729 |
04/04/2024 | Client | 1. A copy of the notice received from Annelie Walsh and from ‘ESB Networks Legal’ in respect of the proceedings as required under Section 150 of the Legal Services Regulation Act 2015. 2. A copy of the Affidavits filed by or on behalf of ESB Networks DAC in relation to the ESB & ESB Networks DAC v Brown High Court proceedings. 3. A copy of the Notice of Motion filed by or on behalf of ESB Networks DAC in relation to the ESB & ESB Networks DAC v Brown High Court proceedings. 4. Invoices issued to ESB Networks DAC by Annelie Walsh and ‘ESB Networks Legal’ in respect of the proceedings. 5. Invoices or fee notes issued to ESB Networks DAC by Counsel in respect of the proceedings. | Part-Granted | 01/05/2024 | FOI00727 |
29/03/2024 | Oireachtas | 1. Minutes of meetings of ESB management regarding the Gearagh between 2023 and 2024; 2. ESB draft management plan on Gearagh. | Refused | 11/04/2024 | FOI00723 |
26/03/2024 | Client | Copies of the "internal" documentation, instructions to staff, memos, schedules etc by which you require and direct your staff to compile (and what information to gather in order to compile etc) returns for submission to organs of the State which identify vacant properties based on electricity usage in accordance with such legislation as compels you to submit same. It would be helpful too to have a copy of such a return - though of course with NO user identity so as to be GDPR compliant. I am willing to amend my request if it will save you time yet still help me answer the key questions. QUESTIONS: It is understood that your company/business/organisation advises an organ of the state when metered supply appears to be unused and thus indicates a Vacant House, which leads to punitive LPT Charges. Accordingly what I am interested to determine is: 1. do you provide such information when usage falls below a certain level ? 2. If "YES" I wish to find out: 2.1 what that certain level is (specified in unit of measure) 2.2 what time period that involves (i.e. measured over a month ? 3 months ? what ?) 2.3 the organ of state to which the return is made (Revenue, Housing what ?) 2.4 if there is specific legislation compelling you to do this, and if so 2.5 what is the specific legislation called (i.e. what Act is it ?) 2.6 Given the provisions of GDPR, whether you are in breach of same? 3 What the "certain level" (see 1 above) is beyond which you would not be compelled to make a return | Part-Granted | 15/04/2024 | FOI00722 |
14/03/2024 | Business/ Interest Group | Minutes of all meetings held between ESB Networks/EirGrid and Clonberne Windfarm Ltd/MKO and any other associated group relating to a planning permission application (ref: 2460230) that ESB Networks have submitted to Galway County Council for the development of a new 38Kv overheadline line (OHL) that will travel from Glenamaddy to Cloonascragh.The planned development consists of 179 polies, up to 18 metres in height, to be erected across several townlands in the North Galway region. I would like to obtain access to the minutes of all the meetings held between ESB Networks/EirGrid and Clonberne Windfarm Ltd/MKO regarding this matter. | Refused | 03/04/2024 | FOI00717 |
14/03/2024 | Business/ Interest Group | Surely there is an operations agreement covering how services generally and including the DPO service is provided? This is a requirement of the DSO licence as I understand it. Can you send me a copy of the relevant Operations Agreement(s)? | Granted | 03/04/2024 | FOI00716 |
05/03/2024 | Client | I am advised that it is esb networks DAC that advise an organ of the state when metered supply appears to be unused and thus indicates a Vacant House, which leads to punitive LPT Charges. As regards esb networks DAC can you tell me: 1. do you provide such information when usage falls below a certain level ? Please answer YES or NO 2. If "YES" please advise 2.1 what that certain level is (specify unit of measure) 2.2 what time period that involves (i.e. measured over a month ? 3 months ? what ?) 2.3 the organ of state to which you make the return (Revenue, Housing what ?) 2.4 if there is specific legislation compelling you to do this, and if so 2.5 what is the specific legislation called (i.e. what Act is it ?) 2.6 Given the provisions of GDPR are you in breach of same ? Please answer YES or NO, and if NO 2.7 Please explain why not 2.8 But if YES then please explain why you do it 3 What is the "certain level" (see 1 above) beyond which you would not be compelled to make a return | Refused | 14/03/2024 | FOI00714 |
27/02/2024 | Client | This request relates to the opening dates of ESB owned and operated electric vehicle chargers. Please see attached a pdf list of the ESB operated chargers I found on the ESB ecars website. Assuming the is the list containing both current and historic ESB charge points, I am looking for the date at which the charge points were opened. Please note the year the charge point became available is sufficient detail in this case. I believe this request falls under condition 9 Provision of Metering and Data Services of the Distribution System Operator’s Licensed functions. | Part-Granted | 22/03/2024 | FOI00710 |
21/02/2024 | Client | Request for a copy of any agreement or memorandum in relation to the procurement or provision of data protection officer services to ESB networks | Refused | 08/03/2024 | FOI00707 |
01/02/2024 | Client | Complaints Handling Procedure With reference to the Distributor System Operator Licence, “Complaints HandlingProcedure” is mentioned in, 'Condition 15' and 'Condition 16' of the Licence. So the Complaints Handling Procedure Document is subject to an 'ongoing revisionprocess'. There is a Complaints Handling Procedure Document. (To 'start' with.)Then there are Periodic Reviews of this Document. By ESBNs, the licencee.If Modifications / Revisions are appropriate, these are communicated to the CRU(Commission for Regulation of Utilities).The CRU approve any suggested Modifications / Revisions.The Complaints Handling Procedure Document is updated and published.And for 'simplicity', one could 'tabulate' the 'ongoing Revision Process'So this is the Data / Records that I am looking for. The Data that I can enter into my 'Tabulation'.And the Records that 'support' the Data.And the actual Complaints Handling Procedure Documents, as they go through their 'updating' / revising. (i.e. Version 1, Version 2, Version 3, etc.)Starting Date' ? So the Requested Period for Data, Records and Documents 21st April 2008 - to the present day (Feb 2024) | Part-Granted | 01/03/2024 | FOI00699 |
23/01/2024 | Business/ Interest Group | I’m requesting information about how many NC applications have been lodged with ESB networks each year since 2021 for NC6, NC7, NC8 and NC5 in Ireland. Also, I would like to know the KWp total per completed NC6, NC7, NC8 and NC5 applications over that time in Ireland. I’m aware for some of these years, some of the various NC schemes above were not active, so please report 0 applications for these years. Can you reply with the information compiled into the below table. | Handled outside FOI | 12/02/2024 | FOI00696 |
22/01/2024 | Client | I would like to request all information, files, documents, dates and details about work carried out by the Esb at Earlsfort Housing development, Haggardstown, Blackrock, Dundalk Co Louth during 2018/2019. In particular, work carried out to the lower undeveloped area of Earlsfort during this time. | Part-Granted | 15/02/2024 | FOI00695 |
15/01/2024 | Business/ Interest Group | Does ESB Networks provide public information about the number of microgen Solar PV systems connected to the grid as of end of year 2023.The information I previously received from you, via John Emerson, was perfect, i.e. the number of installations and the total overall capacity. | Withdrawn | 07/02/2024 | FOI00690 |
05/01/2024 | Client | Please provide the following: 1.Records identifying the firm or firms of solicitors currently representing or retained by ESB Networks DAC, accompanied by a copy of the section 150 letter and/or the contract of engagement for those solicitors. 2.Records identifying the in-house solicitors presently employed by ESB Networks DAC, including copies of the employment contract and/or contract of engagement. 3.Records identifying the in-house solicitors currently employed by the Electricity Supply Board (ESB) who offer or provide legal advice and/or legal services to ESB Networks DAC. Please provide a copy of the contract of engagement and/or agreement between ESB Networks DAC and ESB for the provision of these solicitors and/or the provision of legal services. 4.Invoices issued or received by ESB Networks DAC to or from third parties for the provision of legal advice and/or legal services. Date range 1st January 2020 to date of request. | Refused | 10/04/2024 | FOI00688 |
11/12/2023 | Business/ Interest Group | 1) Hourly water levels for Inniscarra reservoir for October 2023. 2) Total hourly Discharge from Inniscarra Dam for October 2023. | Refused | 12/12/2023 | FOI00682 |
10/12/2023 | Client | I would like to request a copy of the original Turlough hill scope of work, design and the scope of work and design for recent upgrades to the Turlough hill facility. | Refused | 14/12/2023 | FOI00681 |
07/12/2023 | Oireachtas | I am requesting information on how much electricity was generated at the Carrigadrohid Dam, near Macroom, Co. Cork for the last ten years. I request that the amount of electricity generated yearly be broken down into separate figures. I am also requesting information on how many days the dam was in use and operational in 2022. | Refused | 13/12/2023 | FOI00680 |
07/12/2023 | Client | What I'm hoping to get from the ESB is average household and or total Energy Usage by Electoral District for Galway city. The CSO doesn't seem to have any Energy usage by area, only by household type, BER rating. Would it be possibly to get some form of historical report on energy usage by area either electoral Division or CSO Small Area. I'd like to use this data to investigate how energy usage relates to demographics, social class, house prices, education etc, and also correlate the average BER rating to household energy usage | Refused | 22/12/2023 | FOI00679 |
05/12/2023 | Business/ Interest Group | We are working alongside ZEVI to investigate the application of electric vehicle charging map based on the most accommodating places for charges to be installed in Ireland. For this work we need an extensive amount of data on the geography of an area including various electric features such as grid capacity and location of power networks. It seems you are the most likely party to have hold of information regarding low or medium voltage power networks for Ireland and so it would be great to have this information, or be told where to find it. | Refused | 15/12/2023 | FOI00678 |
01/12/2023 | Client | 1. A copy of all reports following internal investigations 2019, 2020, 2021, 2022, and 2023 to date. 2. A copy of all reports following consultation by an outside body for the years 2019, 2020, 2021, 2022, and 2023 to date. 3. The cost of each report. The records that I am requesting are audit reports, reports into waste or losses, reports into wrongdoing or bullying, and any reports following an external consultative process. I am only looking for unpublished reports. | Part-Granted | 03/01/2024 | FOI00676 |
01/12/2023 | Business/ Interest Group | I request a copy of correspondences/emails/reports/meeting records involving The Cork City Council and/or Cork City Council employees and/or Cork City Council elected representative, CField Construction and/or its employees, BMor Developments, Allumcrest Limited and any additional persons/parties regarding the provision of electrical supply at the Lios Cara Estate, Killeens, Cork. Records dating between 14th August 2023 and today | Part-Granted | 06/12/2023 | FOI00675 |
25/11/2023 | Client | How many meter readers have been and are to be let go due to smart meter installation? | Refused | 07/12/2023 | FOI00673 |
23/11/2023 | Journalist | May we please request for the data behind the availability capacity maps (https://www.esbnetworks.ie/new-connections/generator-connections-group/availability-capacity-map), for research purposes. | Granted | 27/11/2023 | FOI00671 |
22/11/2023 | Client | Can you please advise as to how I can request a copy of or inspect the File in respect of the Cuillalea Windfarm based in Kiltimagh, Co. Mayo? | Part-Granted | 15/12/2023 | FOI00670 |
16/11/2023 | Business/ Interest Group | Access to existing MV/LV service maps in an area of Oatfield Co. Clare. This is in regard to the Oatfield wind farm development. The desired maps are for the area seen below, and attached to this document, any help in locating these maps would be greatly appreciated. | Refused | 23/11/2023 | FOI00667 |
08/11/2023 | Business/ Interest Group | I would like to ascertain the civil and mechanical engineering entities that currently hold the following frameworks/contracts: • ESB LV Network Framework • ESB MV Network Framework • ESB HV Network Framework • ESB 110-220 KV HV Framework • ESB 220-400KV HV Framework • ESB EV Framework If this is not possible, can you please let me know what information you could possibly provide in this regard. | Granted | 27/11/2023 | FOI00665 |
07/11/2023 | Business/ Interest Group | Does ESB Networks provide public information about the number of microgen Solar PV systems connected to the grid. I thin it would be of public interest if this information was available. I see that the Irish Solar Energy Association have published figures, quoted as being from ESB Networks, in their State of Solar June 23 Report . | Handled outside FOI | 08/11/2023 | FOI00663 |
07/11/2023 | Client | Under the FOI act 2014, I am requesting a copy of all documents sent, received or produced internally or externally regarding the data about low energy usage sent by the ESB to Revenue. | Refused | 29/11/2023 | FOI00662 |
26/10/2023 | Business/ Interest Group | I am looking for a copy of Tree Clearances from Transmission Lines document (PG567-DI05-007-011) to assist in EirGrid Planning Applications for ESBN projects. | Withdrawn | 26/10/2023 | FOI00656 |
18/10/2023 | Client | Pursuant to the Freedom of Information Act 2014, I am writing to request information held by the Electricity Supply Board (ESB) concerning power outages in Ireland in the years 2022 and 2023, specifically those related to wildlife, birds, and animals. I am seeking a summary of data regarding the number and reasons for power outages caused by wildlife, birds, and animals during this period.Specifically, I request the following information: •Number of Power Outages: A summary of the total number of power outages that occurred in Ireland during the calendar years 2022 and 2023. •Reasons for Power Outages: A detailed breakdown of the reasons for power outages caused by wildlife, birds, and animals during the aforementioned years, including the types of wildlife involved (if available), the locations of the outages, and the duration of each outage. •Mitigation Measures: Any information available on the measures taken by ESB to mitigate power outages caused by wildlife, birds, and animals during 2022 and 2023. | Granted | 23/10/2023 | FOI00653 |
29/09/2023 | Business/ Interest Group | Can you please supply all layout drawings and single line diagrams for the 110KV and 38KV stations in the following areas: Killarney Ballylicky Bandon Dunmanway Barrnahealy Dungarvan Cahir Clonmel Doon 110KV Drogheda Corduff Glasmore Swords College Park Castlebar Trillick Letterkenny | Refused | 17/10/2023 | FOI00649 |
27/09/2023 | Client | I am seeking all information relating to the recent replacement of the ESB Networks pole Rockville Drive, Blackrock, Co Dublin . I am seeking all risk assessments, method statements, road opening licence application and any council permits, minutes of meetings, notices, inspection reports or correspondence relating to same. | Refused | 02/10/2023 | FOI00646 |
19/09/2023 | Journalist | Benefit packages for senior management and top executives of ESB Networks staff for the past decade. | Refused | 17/10/2023 | FOI00645 |
18/09/2023 | Client | Simply Swedish t/a Bryan's Coffee38 BrookfieldKCRDublin 12andBryan's CoffeeJunction Queens Road / East PierDun LaoghaireRef: Application 50 00 46 98 64 - copies of correspondence between ESB Networks and Dun Laoghaire Rathdown County Council in relation to my connection request at Queens Road, Dun Laoghaire.I was dealing with your engineer Tom Perkins at the time Noel Heffernan was Tom's supervisor at the time.Correspondence is from June/July 2022. | Part-Granted | 26/09/2023 | FOI00644 |
15/09/2023 | Client | The names of private contractors who ESBN employed to carry out tree cutting services etc in Sligo and Leitrim from the period 01/01/2018 to date. | Refused | 06/10/2023 | FOI00642 |
13/09/2023 | Business/ Interest Group | In response to a previous email the ESB allowed access to a table of connections in the Millers Glen development, Swords/Oldtown. That table was current to the end of October, 2020.Since that table was compiled several hundreds more homes have been connected. The newer areas have been sold as Longview, Meadowbank and most recently West Mill.We are seeking the total number of homes connected to the ESB grid since the beginning of the Gannon Homes development and do not need an elaborate table. Is it possible to request that new total connection data?The area of our request is south of the R125- north of the Broadmeadow River- east of the Glen Ellen Road/ Castleview extension. | Refused | 22/09/2023 | FOI00641 |
12/09/2023 | Client | In 2018 Bord Pleanala approved TA04.301197. It was for a housing development on route L3004 in Glounthaune. As part of the approval, the developer (O'Mahony Developments, Clash, Cork T45 S382) was to provide a cycle path from the development (Harper's Creek) to Glounthaune railway station. Lighting was to be provided on the cycle path and also to two pedestrian crossings (Toucan). The cycleway and crossing at Harper's Creek were completed and are fully operational. The other crossing at the railway station was completed put has never been activated due to having no electricity supply. I am trying to find out why. To that end I would like the following information dating from 1 January 2018 to August 31, 2023. 1. Copies of all communications that can be read, viewed or listened to between ESB and O'Mahony Developments in regard to the provision of electricity along the cycleway and crossings. 2. Copies of all communications that can be read, viewed, or listened to between ESB and Cork County Council in regard to the provision of electricity along the cycleway and crossings. | Part-Granted | 02/10/2023 | FOI00639 |
09/09/2023 | Client | The material I request is as follows • Communication between the ESB and Monaleen GAA club regarding movement of power lines as per local authority planning application 23336 • Records of any meetings that took place between ESB and Monaleen GAA club regarding same planned change of power lines | Part-Granted | 21/09/2023 | FOI00637 |
07/09/2023 | Client | Under the act I am asking for information concerning the operation of Glasmore Power Distribution Network for dates and times 0300 Friday 18 August until 1900 Sunday 20 August 2023. Also for the period over the August Bankholiday of the 6th, 7th and 8th of August 2023, when power was also lost.These were long outages, but I only need information on:How many customers were affected that required "Manual Resetting" of a trip switch - fuse on a pole to restore power.Time and dates of restoration would be required as information under the FOI Act 2014, on the outage from the Glasmore Network, affecting Lusk town and outlying districts of Richardstown, Woodpark, Colecot, Irishtown and Ballough. I want to know when the power was restored after an engineer came out and pushed the switch back into place. | Granted | 13/09/2023 | FOI00628 |
26/08/2023 | Client | Copies of invoices relating to non-destructive testing (NDT) services provided to ESB dated from 1st January 2022 to 25th August 2023. | Refused | 06/09/2023 | FOI00631 |
21/08/2023 | Client | •If you use an IT Service Management solution (aka ITSM), please advise what you are currently using? (examples include: ServiceNow, BMC, Freshworks, 4ME, Hornbill, ManageEngine, Ivanti etc) Please provide the platform name. •If possible, please also provide the previously utilised solution and reason for change. •When is your current ITSM platform contract due for renewal? Please provide month/year. •Who (if there is one) is your current supplier of professional and managed services for your ITSM platform? •If this is managed internally, please confirm the same. •How many user licences do you have for your ITSM platform? •Who is the principal contact for IT Services within your organisation? i.e. Director of IT or Head of Service Delivery. Please provide Linkedin or available contact details (where appropriate). | Refused | 31/08/2023 | FOI00626 |
15/08/2023 | Business/ Interest Group | I request a copy of correspondences/emails/reports/meeting records involving The Cork City Council and/or Cork City Council employees and/or Cork City Council elected representative, CField Construction and/or its employees, BMor Developments, Allumcrest Limited and any additional persons/parties regarding the provision of electrical supply at the Lios Cara Estate, Killeens, Cork. Records dating between 2018 and today (14th August 2023) Commercially sensitive information for the above can be redacted where apropriate. | Part-Granted | 05/09/2023 | FOI00625 |
09/08/2023 | Business/ Interest Group | I am seeking information under AIE and FOI about any and all communications, including meetings, emails and phone conversations, between the ESB Networks DSO and Ballycar Green Energy https://ballycargreenenergy.ie/ regarding the proposed development of a 12 turbine windfarm in Meelick Co. Clare. Discussions on proposed route for transmission cables, either over ground or underground, tree-felling, timescale, how far advanced the planning of the distribution network for this project is, all relevant information is requested please, as soon as possible. Has an ECP application commenced? | Refused | 15/08/2023 | FOI00623 |
28/07/2023 | Client | Further to the Freedom of Information Act (2014), we request copies of all records createdsince 1 January 2018 relating to an ESB mini-pillar (and any related electrical infrastructure)located in the grounds of Ballinlough House, Churchyard Lane, Ballinlough, Cork T12 T280(folio CK 165055F). | Part-Granted | 25/08/2023 | FOI00622 |
21/07/2023 | Client | Under the Freedom of Information act I am looking for records covering:Legal fees paid by the organisation in utilising legal firms and consultancy firms to consult on and answer FOI requests and appeals of FOI requests including appeals to the Office of the Information Commissioner in the past 5 years.I am happy to clarify or amend this request | Handled outside FOI | 21/07/2023 | FOI00620 |
13/07/2023 | Client | The following information would be helpful for me in my research and in gaining an understanding of my position with regards to an ongoing transaction that I have with the ESB •How many houses in Ireland are currently waiting for a new power connection If you wish to provide me with the data behind this I am happy to receive this and calculate all the above myself. | Part-Granted | 10/08/2023 | FOI00616 |
05/07/2023 | Oireachtas | Copies of financial statements from any barter account which may exist within the ESB, for each of the past five years. | Refused | 19/07/2023 | FOI00611 |
28/06/2023 | Client | Name, work telephone number and work email address for the ESB Networks Manager in the North West region | Withdrawn | 07/07/2023 | FOI10470 |
26/06/2023 | Business/Interest Group | I am doing some research to evaluate the possibility of creating a solar power generation business and as part of this came across your generation map. Unfortunately, the data is severely outdated. Could you kindly update the data or point me to an alternative data source that is equivalent? | Withdrawn | 07/07/2023 | FOI10469 |
15/06/2023 | Client | I wish to request the following information- - information relating to ESB poles in Inchicore Dublin 8. Please email me the records relating to the procedures or schedules around maintenance of ESB poles in Inchicore on the following roads - Partridge Terrace - Railway Avenue - Nash Street - Ring Terrace - Ring Street - Tyrconnell Park - Tyrconnell Street - Tyrconnell Road - St Vincent Street West - Emmet Road - Suir Road How often are the ESB lamp posts inspected for maintenance? What is the annual maintenance routine for ESB poles in Inchicore on these roads? This information is requested by a group of local residents of Inchicore, Dublin 8 who live in and around these streets. When was the last date of a maintenance inspection by ESB of these poles? | Refused | 21/06/2023 | FOI10465 |
09/06/2023 | Client | I wish to access records regarding the erecting of reflectors on the esb power line that passes through the townlands of Sharragh and Lissernane, co. Tipperary. I am specifically looking to access the record of the year the reflectors were erected and confirm that they were erected in response to the number of bird strikes on that power line. | Granted | 25/07/2023 | FOI10463 |
06/06/2023 | Client | I am trying to get planning permission and need to build a case that I lived in the area previously. My parents Edward & Teresa Coree would have had an ESB account from 1972 - 1989 at Pebble Beach, Lower Curragh, Ardmore, Co. Waterford and looking for proof of this. Can you supply that information please? | Refused | 08/06/2023 | FOI10461 |
06/06/2023 | Oireachtas | All records in relation to the government decision on July 14 2009 to take a dividend from ESB and task CRU with distributing it to Large Energy Users via the ESB Network. I would like to limit the search to the period between 1 June 2009 and 31 December 2010 (when any remaining funds were apparently transferred from an ESB account to the CRU’s Carbon Revenue Levy Account). This was a matter for the ESB in so far as records concern its functions under its Distribution System Operator (“DSO”) licence. A copy of the CER’s decision is attached. A section relates to the “implementation of a rebate scheme, funded by ESB, that operated through the electricity network tariffs from 1st January 2009.” This request should include but not be limited to: - Any related correspondence between the then ESB and DECC (then DECNR) - any related correspondence between the then ESB and CRU (then CER) - any related correspondence between the then ESB and the Department for Finance/DPER (which wasn’t existing then but the relevant functions might have moved later) - Any related internal reports, reports to CER/CRU or ministers, records of meetings, minutes, and financial accounts related to the use of the €176m in question. | Part-Granted | 21/07/2023 | FOI10460 |
31/05/2023 | Journalist | copies of any correspondence between ESB Networks and the CRU with regard to the undercharging of Meta for electricity at its Clonee data centre. | Part-Granted | 15/06/2023 | FOI10459 |
19/05/2023 | Oireachtas | I would like to request records under the freedom of information act 2014: - ESB Board Minutes from July to November 2009. - Any correspondence between the then Minister or Department for Communications, Energy and Natural Resources Eamon Ryan and the ESB Board between July and November 2009. | Refused | 09/08/2023 | FOI10457 |
15/05/2023 | Client | I am requesting information on the number of Faults and Planned Interruption over a three-year period from 01/01/2020 to 31/12/2022 with the date, duration and customers affected included for this data like that given in https://powercheck.esbnetworks.ie/. I would like the information in a csv format. | Granted | 22/05/2023 | FOI10455 |
11/05/2023 | Client | Can you please inform what work is being done on power lines in our estate, looks like they put extra power lines? | Refused | 16/05/2023 | FOI10454 |
09/05/2023 | Journalist | A record of the top 20 individual performance related awards, bonus payments, or bonus benefits, awarded/paid to ESB Networks staff for work carried out in 2022, as well as the corresponding salary of each staff member in question. Where sensitive information that cannot be released under the Freedom of Information Act is an issue, I am willing to receive redacted information. Where data is being released it is my preference to receive tabulated/Excel format data. | Refused | 06/06/2023 | FOI10453 |
07/03/2023 | Client | I request all documentation/correspondences/emails/meeting minutes/reports/etc between Cork City Council, Cork County Council, Alumcrest Limited, BMor Developments, CField Construction and any other parties regarding the supply and electrical services at the Lios Cara Estate, Killeens, Cork. This in particular pertains to planning permissions 19/5325 and 19/5416. I specifically request all correspondences/reports/documentation/meeting minutes around road works and associated electrical works at the entrance of the Lios Cara Estate. The road was dug up for reported ESB work between the 18th April 2023 and the 2nd May 2023. | Part-Granted | 31/05/2023 | FOI10451 |
02/05/2023 | Client | I gcomhréir le hAlt 12 de chuid an Acht um Shaoráil Faisnéise, iarraim rochtain ar thaifid: neamh-phearsanta. Seo iad na taifid atá iarraidh agam ná: Táim ag iarriadh gach leagan den Phlean Gníomhaithe ar son na hAeráide, atá de dhualgas ag gach eagraíocht a bheith acu de réir an Acht Aeráide, le 1. Sonraí iomlán de gach Phleann a bhí agat ó dul-i-bhfeidhm an Achta 2. Dáta ar a foilsíodh gach Plean 3. Dáta ar a chuaigh gach Plean i bhfeidhm 4. An méid airgead, miondhealaithe de réir cúiseanna na gcoastas, a caitheadh ar chruthú agus ar chur i bhfeidhm gach Plean | Refused | 17/05/2023 | FOI10450 |
13/04/2023 | Business/Interest Group | Access to underground cables records for the GAA grounds, see attached application form and site location map for your information. | Handled Outside FOI/Withdrawn | 25/04/2023 | FOI10446 |
13/04/2023 | Client | I am currently completing my degree in Environmental Management with Atlantic Technological University. I have an assignment on the Life Cycle Assessment of a product or service and have chosen the life cycle of a solar panel. Can you tell me or point me in the direction of finding out how much energy was generated from domestic solar installations in 2022?? | Handled Outside FOI/Withdrawn | 26/04/2023 | FOI10444 |
08/04/2023 | Business/Interest Group | Shapefiles and/or other GIS data related to the publication: Burke, B. (2018). “Trialling a Seabird Sensitivity Mapping Tool for Marine Renewable Energy Developments in Ireland”. Report by BirdWatch Ireland. Funded by This project was funded by the National Toll Roads Foundation, ESB Networks and Eirgrid. | Refused | 02/05/2023 | FOI10443 |
31/03/2023 | Client | I would like to make a quick enquiry under the Freedom of Information Act. In answering please provide precise references for each point. Thank you in advance. 1. Please advise whether or not the standard non smart electricity meters which are currently installed at residential properties have been paid for indirectly by the owner/occupier of the property via customer charges for use of the electricity network. 2. Please advise where in the DSO licence agreement or other regulatory or legal document it is stated that the current non smart meters and new smart meters are the property of ESB Networks. 3. Can you confirm whether any condition under the DSO licence or any other relevant regulation precludes a customer, residential or commercial, from having a non smart meter installed in their property for the purpose of electricity consumption monitoring at such time as a new meter is required. 4. Please advise whether such installation, if not precluded by law, must be done by ESB networks at no direct charge to the customer. 5. Please advise whether or not the new smart electricity meters which are currently being installed at residential properties will be paid for indirectly by the owner/occupier of the property via customer charges for use of the electricity network over the coming years | Refused | 18/04/2023 | FOI10442 |
29/03/2023 | Business/Interest Group | Would it be possible to provide the information that will show the generation capacity of the sub stations throughout the country. As a renewable energy developer, our company is very keen to invest in Ireland, particular with both solar and BESS projects | Refused | 21/04/2023 | FOI10440 |
01/03/2023 | Client | A copy of the memorandum of understanding between ESB Networks DAC and the CSO. I am further requesting any correspondence both internal and external about the data shared. I am also requesting any risk assessments done about how sharing this data may violate GDPR. | Part-Granted | 25/04/2023 | FOI10429 |
24/02/2023 | Client | A copy of the memorandum of understanding between ESB and the CSO. I am further requesting any correspondence both internal and external about the data shared. I am also requesting any risk assessments done about how sharing this data may violate GDPR. | Refused | 28/01/2023 | FOI10428 |
20/02/2023 | Client | The number of applicants received and the number of apprentices taken on for the ESB Apprenticeship Programme for the following years; 2018, 2019, 2020, 2021 and 2022. | Refused | 03/02/2023 | FOI10426 |
14/02/2023 | Client | I am requesting the following information under the Freedom of Information Act In the last 12 months the number of power outage for the Corlea/Derrykillew are in Ballyshannon Co Donegal - How many of these outages were planned - How many of these outages were unplanned - The length in hours and minutes for each outage - The cause of each outage where known - What has been undertaken to rectify each outage | Granted | 24/02/2023 | FOI10422 |
27/01/2023 | Client | I am requesting a copy of all documents, reports, verbal records, email records, postal records, memos, or any other record format in relation to any complaints or data of supply network spikes/power surges/disruptions/high voltages/low voltages/ faults/effects. The locality we are interested in is in the townland of Powerfield, Fedamore, Co Limerick, on the 26th, 27th and 28th February 2022. | Refused | 13/02/2023 | FOI10417 |
23/01/2023 | Client | I live in the village of Aughrim, County Wicklow. Over the past 6 to 7 months we have unfortunately had approx 7 faults from the Kilmagig sub station which can affect over 2,000 customers at a time. I would like to know (The Freedom of Information Act 2014 (FOI Act)) as to why this fault is occurring in such high frequency and what does the ESB plan to do in terms of overcoming this issue. It would be beneficial if you can supply the information and register the complaint and query without the use of the FOI Act. Twice over the last two weeks we have had to deal with power outages in our areas. It impacts our village businesses to the order that they must close. We have to drive 35 kilometres in total, in order to get warm food. As a community we are entitled to know what the cause of these faults is and how and when it will be remedied with an upgrade etc to the Kilmagig station. | Handled Outside FOI / Withdrawn | 08/02/2023 | FOI10414 |
17/01/2023 | Client | 1. All records relating outages of plant and lines at Glassmore substation, which resulted in the disconnection of more than 1000 customers, in the period from 00:00 on 16 September 2022 to 23:59 on 16 January 2023, to include, in relation to each outage: a. the start and end time of the outage; b. the level in the network at which the outage occurred 110 kV,. 38kv; c. the specific cause of the outage; d. whether any relevant redundant plant or lines were out of service at the time of the outage and whether or not that contributed to the outage; e. whether any recommendations were made to reduce the likelihood of a reoccurrence of similar outages and, if so, whether those recommendations have been implemented or are planned to be implemented; f. whether the tripped breakers are capable of being closed against full load or whether breakers at a lower level need to be opened first; and g. whether the relevant breakers can be closed remotely, or whether a crew needs to be dispatched and where a crew would normally be dispatched from. 2. All records relating to whether there is any redundancy in the plant and lines supplying the Lusk area from Glasmore and identifying single points of failure in the supply to Lusk. | Part-Granted | 13/12/2023 | FOI10412 |
11/01/2023 | Journalist | 1. The total number of accounts that have fallen into arrears between 20/02/22 and 11/01/23. 2. How much money was spent by the ESB on debt collection services between 20/02/22 and 11/01/23 broken down by month. 3. How much money was recovered by debt collection companies for the ESB between 20/02/22 and 11/01/23. 4. The names of the companies used by the ESB for debt collection services. 5. A copy of any complaints the ESB received about debt collection companies working on behalf of the ESB | Withdrawn | 12/01/2023 | FOI10411 |
16/12/2022 | Journalist | I would like to request all correspondence between senior management of ESB Networks DAC and the corporate entities controlling garage forecourts in Ireland. I wish to request correspondence which is specifically related to the price of providing connections to the distribution system for electric charging points. (In a nutshell I understand there has been discussion regarding the price ESB is charging garage forecourts nationally to install charging points for electric cars and I'm trying to request that documentation.) | Refused | 13/01/2023 | FOI10404 |
13/12/2022 | Business/Interest Group | Every year we hang Christmas lights along Main St, in our village. It is important to recognise the following two points: that we have qualified electricians within our volunteer base who have experience in erecting such displays, annually , and we are gifted the electrical supply by the good will of businesses and residents along the street, so there is no question of syphoning the supply. This year that activity took place on the weekend of 26 and 27 November, 2022, and again on Tuesday 29th.The following day we understand a complaint was lodged with ESB Networks and while we in TTT did not receive notification of the complaint directly, one of our qualified volunteers did. We further understand that the complaint included photographic evidence of the festive lighting installed. Through FOI we would like to request copies of the following: Original complaint lodged, citing full details of the complaint against TTTs work in the community | Part-Granted | 16/12/2022 | FOI10403 |
07/12/2022 | Journalist | All correspondence between ESB and services stations (ie: petrol and diesel retailers) in the Republic of Ireland regarding the installation charging points for electric cars on forecourts. I would like this request to cover the period from January 1, 2021 and the present day. I would like the request to cover all letters and emails | Refused | 16/12/2022 | FOI10402 |
30/11/2022 | Business/Interest Group | A copy of the DPIA associated with the collection of data on households through smart meters by ESB Networks. | Withdrawn | 09/12/2022 | FOI10401 |
25/10/2022 | Client | I would like to request, under the Freedom of Information Act, all records and correspondence held by the ESB/between the ESB and tech companies about preparations, contingency planning and any other plans, strategies, concerns or discussions for potential blackouts this winter | Part-Granted | 23/11/2022 | FOI10399 |
11/10/2022 | Client | All data or correspondence relating to the site at the ESB sub station at Greenlea Grove, maps, site visit notes, emails in relation to the sale of the site, advice or opinions sought by the developer or between departments in ESB and or ESBN in connection with the original and subsequent planning applications and also during the development at the site, documentation of any assessments made by ESB on the plans for the hobby workshop or any other changes made under the original planning granted, requests for meetings at the site by the developer, subsequent summary notes of any meetings which may have taken place following onsite meetings, correspondence, if any, with the developer in relation to the painting of the sub-station or suitability of the site for development with any 3rd parties and any general communication which references this location e.g. legal department, engineers, security etc between 22 February 2022 and 10 October. | Part-Granted | 02/11/2022 | FOI10395 |
03/10/2022 | Client | The official statement and official reasons why there was a power outage in Shelbourne Road Limerick on the 2 day of October 2022 | Granted | 24/10/2022 | FOI10394 |
27/09/2022 | Client | 1. Since 2000 how many communications have you had from customers in relation to any and all concerns they have with TIMECLOCK ERRORS on the electricity meter supplied to them 2. Has there been an internal review of faulty or erroneous meter timeclocks supplied to customers since 2000, and can you provide a copy of this 3. In relation to customers who may have been overcharged, what is the procedure for addressing this? 4. In instances where customers may have been undercharged, what procedure do you follow 5. Where inaccurate equipment has been installed, has each customer affected been notified. 6. Can you outline how it may occur that faulty timeclocks have been installed, ie who is to blame for inaccurate timeclocks. | Part-Granted | 25/10/2022 | FOI10393 |
14/09/2022 | Client | All email correspondence between ESB and the Department of Energy between March 1, 2022 and September 14, 2022. | Refused | 25/10/2022 | FOI10390 |
09/09/2022 | Journalist | 1. Does the ESB provide a discount or subsidy to employees on their gas and/or electricity bills? 2. If so how many employees are entitled to it? 3. How is the discount calculated - ie is it a fixed amount per employee and if so what is that fixed amount? Or is it a percentage of the total bill? Or is it some other method? 4. How much did the discount cost the company for the last full financial year? Will the cost of the discount to the company increase in line with increases in energy prices? | Refused | 12/09/2022 | FOI10387 |
08/09/2022 | Client | 1. Access under 2014 Act to details of suppliers of area maps for Sligo town used on ESB Networks website. The query also seeks date of Sligo map currently used on website and seeks date of its most recent revision. 2. Access under 2014 Act to any corporate description, internal or external, as how/why Martin Savage Terrace is excluded from such maps. When did this exclusion commence? | Granted | 28/10/2022 | FOI10386 |
29/08/2022 | Journalist | Records that show the number of electricity disconnections undertaken by ESB Networks under direction of suppliers for a non-payment of debt, from 1 January 2019 to date, and broken down by: i. month if possible -- so for Jan 2019, Feb 2019, March 2019 -- and if not by quarter and also by residential and non-residential connections each month iii. and I would like the figures broken down for Co. Dublin, and outside of Co Dublin | Part-Granted | 23/09/2022 | FOI10384 |
28/07/2022 | Business/Interest Group | Information on connection date/details on the individual phases/units and meter installations in Drynham Heath development Feltrim, Kinsealy, Co Dublin. | Granted | 19/08/2022 | FOI10383 |
27/07/2022 | Client | A copy of the board minutes for the most recent six-month period that they are available. | Part-Granted | 24/08/2022 | FOI10382 |
27/07/2022 | Client | All records and correspondence in relation to flooding, flood defence, sewage discharges onto sandmount strand with OPW, Irish Water and DCC. All records and correspondence with the above parties in relation to proposed cycle path on Beach Road and Strand Road, Sandymount. | Part-Granted | 16/08/2022 | FOI10381 |
25/07/2022 | Journalist | Copies any and all quarterly earnings/profit/financial reports compiled for ESB Networks so far this year. | Refused | 12/08/2022 | FOI10380 |
19/07/2022 | Client | Request access to the following documentation between the years of 1996 and 2000: 1. The full record of annual maximum peak follows recorded at the following gauging stations that were operated by ESB: a. Lee at Leemount Upper; b. Lee at Leemount Lower; c. Shournagh at Healy's Bridge. 2. Regulations and Guidelines for the Control of the River Lee. 3. Tables showing the relationship between water level and stored volume for Inniscarra and Carrigadrohid Reservoirs | Refused | 27/07/2022 | FOI10378 |
08/07/2022 | Client | On the 8/10/2021 I received an email from you in response to an FOI request regarding outages in my area - FOI 10341. I now wish to request the same information up to and including the 8/7/2022. In virtually all outages in our area the same 106 customers are affected yet that figure appears nowhere on the list I received. | Granted | 03/08/2022 | FOI10376 |
06/07/2022 | Client | Access to any external evaluations of the board of ESB since 2018 | Refused | 15/07/2022 | FOI10375 |
13/06/2022 | Business/Interest Group | 1. In relation to all CCTV cameras that you have procured from 2017 until the present, please provide: the names of each company and the names of the products including the model numbers the contracts with each company the cost per unit and the total costs, and the duration of contracts and/or licenses. 2. Please provide records that state the capability of the CCTV cameras (along with their storage and processing units whether locally, on a server or in the cloud), such as facial recognition, temperature/thermal scanning, behaviour analysis, object detection or demographic detection (i.e. age, gender, clothing etc). 3. Please also provide the documents and communication related to the tender process for all CCTV cameras, that has been procured between 2017 until the present. | Refused | 30/06/2022 | FOI10374 |
31/05/2022 | Business/Interest Group | All documents which evidence that the fibre optic cable laid was part of the original scheme in connection with the Arva shankill No. 2 110Kv line in 2012. Any documents which establish as a fact, whether the initial 2012 project included the additional fibre optic or if the 2012 line was completed, whether the addition of a fibre optic cable at a later date amounted to an alteration of the line. | Refused | 23/06/2022 | FOI10371 |
30/05/2022 | Business/Interest Group | 1. Records describing the overhead route options considered for the proposed Great Island-Knockmullen 38kV line. 2. Records describing the underground route options considered for the proposed Great Island-Knockmullen 38kV line. 3. Records of the decision not to proceed with the route options described at 1 and 2 above. 4. Records, in the form of a map/drawing or other form, showing the preferred/chosen route for the proposed Great Island-Knockmullen 38kV line. 5. Records describing the criteria used to assess each of the route options, and any such assessment, considered for the proposed Great Island-Knockmullen 38kV line | Refused | 22/06/2022 | FOI10370 |
20/05/2022 | Journalist | A copy of all reports of the scientific analysis, and structural engineering analysis, undertaken in relation to the Poolbeg chimneys and their foundations, on behalf of the ESB dated between November 1, 2021 and 20 May, 2022. | Refused | 01/06/2022 | FOI10370 |
08/04/2022 | Client | Statistical data of purchase of electric vehicles in Ireland between January 2021 and March 2022. | Refused | 19/04/2022 | FOI10365 |
29/03/2022 | Client | Access to a map, detailing the ESB Distribution System, in County Galway. | Refused | 08/04/2022 | FOI10363 |
16/03/2022 | Business/Interest Group | A full exhaustive list of 2021 and 2022 outages and reasons for outages in the Killenard area. | Granted | 31/02/2022 | FOI10362 |
21/02/2022 | Client | All data or correspondence relating to or which mentions the site at the ESB sub station at Greenlea Grove, maps, site visit notes, emails in relation to the sale of the site, advice or opinions sought by the developer or between departments in ESB and or ESBN in connection with the original and subsequent planning applications and also during the development at the site, documentation of any assessments made by ESB on the plans for the hobby workshop or any other changes made under the original planning granted, requests for meetings at the site by the developer, subsequent summary notes of any meetings which may have taken place following onsite meetings, correspondence, if any, with the developer in relation to the painting of the sub-station or suitability of the site for development with any 3rd parties and any general communication which references this location e.g. legal department, engineers, security etc between 1 February 2020 and 21 February 2022. | Part-Granted | 08/03/2022 | FOI10361 |
16/02/2022 | Journalist | A record of the minutes of a meetings of the ‘Housing Analytics Group’ (established in 2017 by the Department of Housing) attended by ESB staff in relation to using ESB networks data to identify homes deemed likely to be vacant/derelict. This should also include a record of documents shared at these meetings, dated between May 1, 2017 and the date of this request. | Refused | 10/03/2022 | FOI10360 |
16/02/2022 | Client | The number of power outages that have affected the Kerry-Tralee - Inch line. I would like all recorded data please. I would like to compare power outages against the national average. | Part-Granted | 10/03/2022 | FOI10359 |
31/01/2022 | Client | 1. The number of vehicles and trailers owned by ESB Networks in the years 2019, 2020 & 2021. 2. The numbers of vehicles leased in the years 2019, 2020 & 2021. 3. The cost of vehicle maintenance in the years 2019, 2020 & 2021. 4. The cost of trailer maintenance in the years 2019,2020 & 2021. | Refused | 21/02/2022 | FOI10358 |
20/01/2022 | Client | The plans and details of dimensions for Inniscarra dam County Cork. | Refused | 31/01/2022 | FOI10357 |
12/01/2022 | Client | All records of power outages from 15 June 2017 – 15 December 2021 affecting Parkmore West Business Park, Western Distributor Road, Knocknacarra, Galway. | Granted | 27/01/2022 | FOI10356 |
15/12/2021 | Oireachtas | All records, correspondence, reports, and meeting minutes held in relation to the scheme to make €100 payment to all domestic electricity accounts? | Part-Granted | 14/01/2022 | FOI10353 |
12/12/2021 | Business/Interest Group | All communications and documents, written or emailed between ESB Networks and any agent/employee of South Dublin County Council (SDCC) between 01/01/2019 and 12/12/2021 regarding the 10kv Substation at Pearse Brothers Park, Ballyboden, Dublin and the Green Space to the North of the substation. And all communications and documents written or emailed between ESB Networks and any agent/employee of South Dublin County Council (SDCC) between 01/01/2019 and 12/12/2021 regarding the 10kv Substation at Pearse Brothers Park, Ballyboden, Dublin and the proposed development of the green space to the north of the substation for age friendly housing or any other type of development by SDCC. And any document or communication, written or emailed between ESB Networks and any agent/employee of South Dublin County Council (SDCC) between 01/01/2019 and 12/12/2021 that relates to the future expansion of the 10kv substation at Pearse Brothers Park, Ballyboden, Dublin onto the green space to the north of the substation. | Refused | 07/01/2022 | FOI10352 |
09/12/2021 | Journalist | Information relating the theft of wiring and other items from ESB networks. The number of suspect thefts of wires and other infrastructure from ESB Networks in 2021 and in each of the previous five years. As far as possible, please include the details of each incident including value of material stolen. | Part-Granted | 07/01/2022 | FOI10351 |
24/11/2021 | Client | All records in relation to the last public safety maintenance / inspection in the Kenmare area in 2020? | Part-Granted | 14/12/2021 | FOI10348 |
11/11/2021 | Client | A copy of the application details, including any representations made, for an alternation/new service supply to a property. Details of all communications between ESB Networks and the property owner/ESB client regarding this service alterations and the requirement for such. | Part-Granted | 25/11/2021 | FOI10346 |
09/11/ 2021 | Client | All complaints / reports to ESB Networks in relation to noise, vibration and electrical or electro-magnetic interference or output in Kenmare since 1 January 2021 and all records in relation to any such complaints. All records between ESB Networks and any third party in relation to any such complaints since 1 January 2021, in particular any communication with Kerry County Council, the HSE, Kenmare Hospital or other agencies or bodies. All records in relation to any inspection or monitoring of noise, vibration and electrical or electro-magnetic interference or output in Kenmare since 1 January 2021. All and any complaints or maintenance requests or other records in relation to ESB transformer boxes and other electrical equipment in Kenmare since 1 January 2021 | Refused | 24/11/2021 | FOI10345 |
11/10/2021 | Client | The number of customers served by ESB per LV transformer | Withdrawn | 19/10/2021 | FOI10343 |
29/09/2021 | Client | All outages in Tirmoghan area of Kilcock, Co. Kildare in the past 5 years including the duration of each outage and the number of customers affected in each outage | Part-Granted | 08/10/2021 | FOI10341 |
15/09/2021 | Client | Details about the Wicklow County Council Application to ESB networks to supply power to a mini pillar and kiosk at Callowhill, Newtownmountkennedy, Greystones, Co Wicklow. This kiosk and mini pillar are part of the Vartry to Cronroe water
supply scheme for Wicklow. (Contract 8A). ESB conditions to Wicklow County Council to supply power to the kiosk and mini pillar. RE: Telecom aerial on footprint of the kiosk, is it a ESB telecom aerial or another telecom provider? These works were completed in 2014. | Part-Granted | 13/10/2021 | FOI10338 |
10/09/2021 | Client | Details about the Wicklow County Council application to the ESB to supply a kiosk at Callowhill, Newtownmountkennedy Greystones, Co Wicklow. This kiosk was part of the Vartry to Cronroe water supply scheme for Wicklow. The ESB conditions was to supply power to the kiosk, works were completed in 2013-2014. | Withdrawn | 15/09/2021 | FOI10336 |
02/09/2021 | Journalist | How many charging points are located across Northern Ireland with a breakdown for each council area? If not per council area, the number of points per county would be great. How many of the charging points are currently faulty? How many reports of faults have you had this year? A comparative figure to the last few years that would also be helpful. Any reports of charging points being vandalised in Northern Ireland? How much does the installation of a charging point cost? How many points are estimated to be located across Northern Ireland by the end of the year? | Refused | 13/09/2021 | FOI10333 |
02/09/2021 | Client | How many meters have been installed in my immediate location including Drynam Road, Drynam Court and Foxwood. What advantage I gained from this change and when I will have access to usage information that will help me control my consumption. | Part-Granted | 10/09/2021 | FOI10331 |
11/08/2021 | Client | 1) The total amount that ESB Networks spent on external legal advice in the years of 2019, 2020 and to-date in 2021 in tabular form 2) The amount ESB Networks paid each external legal firm for work carried out on its behalf in the years of 2019, 2020 and to-date in 2021 in tabular form | Refused | 07/09/2021 | FOI10329 |
04/08/2021 | Client | I would like to request information in relation to discussions that took place between Lidl Ireland and The ESB in relation to capacity issues for the provision of EV charge points at the LIdl store on Mount Agnes Road in Churchfield Cork City from 01/ February 2015 until the present day please. The info I request centres around why these EV chargers are not present today and relate to what the rational from Lidl that is down to a power supply capacity issue. | Refused | 09/09/2021 | FOI10328 |
29/07/2021 | Journalist | Records/documents showing the cost of security and rental of generator at Coolcower, Macroom, Co Cork since 2012. The site in beside the Carrigadrohid reservoir, which provides drinking water to about 95,000 people and also supplies the ESB’s Lee Hydro Scheme downstream at Inniscarra | Refused | 10/08/2021 | FOI10327 |
06/07/2021 | Journalist | All meeting minutes, agendas and the future meeting schedule of the Electricity Supply Board Defined Contribution Pension Scheme - Finance and Investment Committee. | Refused | 03/08/2021 | FOI10326 |
26/07/2021 | Journalist | Correspondence to and from the CEO of the ESB on the West Offaly Power Station being demolition and/or alternative uses relating to the impact it would/could cause to the ESB's Distribution system operator licence. | Refused | 09/08/2021 | FOI10325 |
20/07/2021 | Client | Any information you might furnish on the number and extent of power outages in the Republic of Ireland over the period of the last five years. That is between June 2016 and June 2021. | Granted | 10/08/2021 | FOI10324 |
14/07/2021 | Journalist | Correspondence to and from the CEO of the ESB on the West Offaly Power Station also known as Shannonbridge Power Station relating to the demolition and/or alternative uses for the site within the last 12 months. | Refused | 19/07/2021 | FOI10323 |
05/07/2021 | Client | ESB Networks' policy and procedures in relation to connecting private property of another landowner. Does ESB Networks have-in printed form-a policy covering situations where one landowner contested the right of another individual to establish a connection to the electricity network over the land of the former individual and can a copy
of that policy be obtained? (A copy of the relevant section(s) and the title page would suffice). | Granted | 23/07/2021 | FOI10322 |
25/06/2021 | Business/Interest Group | A breakdown on a locality and district basis of the PSO levies since their introduction. If there is list giving the distribution districts this used a three-digit numerical identifier which was based on 10kV distribution districts. | Refused | 21/07/2021 | FOI10320 |
15/06/2021 | Client | For each of the years 2010 to 2021 inclusive: 1) Number of day/night meters and meter time switches replaced by the ESB. 2) Number of day/night meters and meter time switches replaced by the ESB following a fault reported by the customer of that meter. 3) Number of day/night meters and meter time switches replaced by the ESB following a fault reported by an ESB technician. 4) Number of day/night meter time switches recorded as faulty. 5) Number of customers who received a rebate as a result of a faulty day/night meter time switch. 6) Total annual amount in euros of rebates issued to customers as a result of day/night meter time switch faults | Refused | 12/07/2021 | FOI10318 |
06/05/2021 | Business/Interest Group | The number of each type of residential meter in the Republic of Ireland; MCC01, MCC02, MCC51, MCC12, MCC16. Etc. | Withdrawn | 20/05/2021 | FOI110317 |
02/04/2021 | Client | All communication between ESB Networks and Irish Rail or consultancy firms such as Arup appointed by Irish Rail regarding electrification of the railway between Malahide and Drogheda as part of the DART+ project between 01/01/21 and present day. | Part-Granted | 30/04/2021 | FOI110314 |
29/03/2021 |
Journalist |
All details, letters, emails and other correspondence from third parties acting on behalf of EirGrid from ESB/ESB Networks regarding the North South Interconnector to the Department of Communication, Climate Action and Environment, on or after 1 January 2015. All details, letters, emails and other correspondence from third parties acting on behalf of EirGrid from ESB/ESB Networks regarding the North South Interconnector to Cavan/Monaghan/Meath County Councils, on or after 1 January 2015. Records prepared or considered by Department on or after 1 January 2015 in relation to the alteration, diversion or undergrounding of the North-South Interconnector Records sent by EirGrid to the Department Networks on or after 1 January 2015 in relation to the alteration, diversion or undergrounding of the North-South Interconnector. |
Refused |
20/04/2021 |
FOI10331 |
24/03/2021 | Journalist | Details of all complaints and any actions taken by the ESB after complaints to ESB Networks made by residents of Longford and in tabular form between March 1st 2020 and March 1st 2021. Details of all complaints and any actions taken by the ESB after complaints to ESB Networks made by residents of Roscommon and in tabular form between March 1st 2020 and March 1st 2021 Details of all complaints and any actions taken by the ESB after complaints to ESB Networks made by residents of Leitrim and in tabular form between March 1st 2020 and March 1st 2021 | Part-Granted | 20/04/2021 | FOI10311 |
05/03/2021 | Client | The cost of producing for the publication titled: "Housing Schemes: Guidebook for ESB Networks Standards for Electrical Services Revision 5 January 2014" | Part-Granted | 23/03/2021 | FOI10309 |
15/02/2021 | Client | All information regarding planned power interruption scheduled for 17th February 2021, Carrrick-on-Shannon. 1. Necessity of cutting power to vulnerable customers in winter is there and work could not wait. 2. Covid rules rules are not being broken and that waiting would not be a better option. | Granted | 01/03/2021 | FOI10305 |
12/02/2021 | Client | Location details within Ireland where dwellings have been built adjacent (within 5M) to a substation. | Refused | 02/03/2021 | FOI10304 |
06/02/2021 | Client | Details of the salary grades used for staff employed in Health & Safety Management roles. | Refused | 02/03/2021 | FOI10302 |
01/02/2021 | Journalist | 1. The cost (broken down by year) of the maintenance of the Poolbeg chimney stacks by ESB Networks, for each year from 2015 to 2020. 2. A breakdown in any other costs related to the Poolbeg chimney stacks, broken down by each year from 2015 to 2020 | Refused | 04/02/2021 | FOI10301 |
28/01/2021 | Business/Interest Group | 1. A copy of (i) the contract/agreement with Siro Limited in relation to the “capital contribution of network assets worth €0.9 million” which is referred to in page 25 and page 28 of the Siro accounts to year end 31 December 2019, (ii) the valuation/report on this transaction and (iii) a copy of the minutes of the meeting where this transaction was approved. 2. A copy of (i) the “network access agreement (IRU)” and (ii) the “business and asset transfer agreement” referred to in the Siro Limited annual accounts for year-end 31 December 2019. 3. A copy of (i) the valuations and/or reports carried out by or on behalf of ESB and/or ESB Networks DAC in relation to the “network asset agreement (IRU)” and/or “business and asset transfer agreement “ transaction of €100 million which is identified in page 25 the Siro Limited accounts and (ii) a copy of the minutes of the meetings where the €100 million deal/contract was approved (iii) and a copy of the decision to approve the transaction. 4. Records showing the extent and nature of services provided to Siro Limited by ESB Networks DAC and/or ESB Networks relevant personnel in the past 12 months and the amounts paid by Siro Limited for those services. | Refused | 24/02/2021 | FOI10300 |
25/02/2021 | Business/Interest Group | 1. Records of the procurement process for steelwork/pylon designs for the north south interconnector project including but not limited to: (i) a copy of the procurement documentation issued: (ii) a copy of all steelwork/pylon designs considered for use on the the north south interconnector project; (iii)a copy of the decision to award the contract/framework agreement/tender under the procurement process for steelwork/pylon design for the north south interconnector including the minutes of the meeting where the decision was made: (iv) a copy of the contract/framework agreement/tender awarded under the procurement process: (v) a copy of the steelwork/pylon designs and specifications which have been approved for the north south interconnector project. (iv) a copy of any orders placed under the contract/framework agreement/tender. 2. Records of the procurement process for the supply of steelwork/pylons for the north south interconnector project including but not limited to: (i) a copy of the procurement documentation issued: (ii) a copy of the contract/framework agreement/winning tender for the supply of steelwork/pylons for the north south interconnector: (iii) a copy of the decision to award the contract/framework agreement/tender under the procurement process for the supply of steelwork/pylon for the north south interconnector including the minutes of the meeting where the decision was made: (iv) a copy of any orders placed under the contract/framework agreement/tender. 3. Records of any other framework agreements/contracts/tenders awarded for the supply of materials and/or the carrying out of works on the north south interconnector project including but not limited to a copy of the contract/framework agreement/contract. | Refused | 28/01/2021 | FOI10299 |
18/01/2021 | Client | 1. Number of engineering staff in your organisation who were paid or reimbursed either in part or full their annual membership fees for Engineers Ireland for the years 2018 and 2019. 2. A list of all and any other professional subscriptions or membership fees (broken down by name of institution, and staff grade and number of each separately) either paid or reimbursed, party or fully, during 2018 and 2019. | Refused | 21/01/2021 | FOI10295 |
18/01/2021 | Business/Interest Group | ESB’s overhead line construction manual or a specification as we intend to build a new wind farm and need to assess the grid connection. | Handled Outside FOI/Withdrawn | 26/01/2021 | FOI10294 |
15/01/2021 | Client | A copy of the report "DF08-03 AP01 Independent Expert Report on Long Term Investment Needs (Pictures of the Future)" that was sent to the CRU regarding PR5? Also can you send me the link for Poyry TNEI report that was used to inform the above document? | Withdrawn | 09/02/2021 | FOI10293 |
08/01/2021 | Client | a) Customer Minutes Lost on average per customer affected for storms during 2020. b) Longest period of outage (customer minutes lost) for more than 100 customers as a result of a storm in 2020. If the figures are not available for 2020, I will accept figures for 2019. | Granted | 01/02/2021 | FOI10292 |
17/12/2020 | Business/Interest Group | Can you please release the prioritisation list of projects to be processed under ECP2.1 Can you please send on the list projects which qualified under the following categories; • Battery Projects • Top 25 Renewable Projects as set out under the ECP2 ruleset • Projects by date order of planning • NGPA • Community projects | Withdrawn | 18/12/2020 | FOI10291 |
10/12/2020 | Client | All available details of the obligations of ESB Networks Ireland to US Department of Defense’s Defense Logistics Agency (DLA) and/or NATO wrt Commercial and Government Entity Code SYV18 | Refused | 06/01/2021 | FOI10289 |
21/11/2020 | Business/Interest Group | All data pertaining to the sale and subsequent development of the site at the ESB substation including legal agreement transferring ownership, conditions of sale, maps, any emails in relation to the sale of the site, advice or opinions sought by the developer in connection with the original and subsequent planning applications and also during the development at the site, documentation of any assessments made by ESB on the plans for the hobby workshop or any other changes made under the original planning granted, requests for meetings at the site by the developer, subsequent summary notes of any meetings which may have taken place following onsite meetings, correspondence, if any, with the developer in relation to the painting of the sub-station by the developer. I would like to receive this information in PDF format. | Part-Granted | 18/12/2020 | FOI10288 |
09/11/2020 | Journalist | The details of all complaints made by residents of Longford, Leitrim and Roscommon, Cavan and Monaghan in tabular form, to ESB Networks between March 1st 2020 and November 9th 2020? Details of all actions taken by the ESB after complaints made by residents in Longford, Leitrim and Roscommon Cavan and Monaghan in tabular form, between March 1st 2020 and November 9th 2020? | Part-Granted | 01/12/2020 | FOI10285 |
09/11/2020 | Client | A copy of all email and other correspondence relating to planning, community consultation, commercial arrangements, contracts and planning permissions for the erection of masts for telephony and other purposes at the ESB Milltown station, Cowper Drive and Park Drive, Dublin 6. | Refused | 19/11/2020 | FOI10284 |
30/09/2020 | Client | The number of homes at Millers Glen development in Swords which are connected to your network. The number for all phases of the development from today to the commencement around 2015. | Part-Granted | 22/10/2020 | FOI10279 |
17/09/2020 | Client | Information on any evidence of medical cases linked to the Carrickmines 220kV line | Refused | 28/09/2020 | FOI10276 |
26/08/2020 | Business/Interest Group | Statistics on connection & contracted micro-generation solar PV*. This would cover a 20-year period from 2000-2020 up to 6kW single/11kW three. Total overall amount of installed import/export meters, etci certs/NC6 forms. ISEA is also seeking statistics on connected & contracted commercial solar PV. This would cover a 20-year period from 2000-2020 from 6kW and above to 2000kW. Total overall amount of installed import/export meters nc5/nc5a approved forms. *includes new build applications with multiple dwellings that use ESB spreadsheet’’ | Granted | 23/09/2020 | FOI10273 |
01/08/2020 | Client | The EMF readouts for the new smart meters, how much radiation do they emit? are they dangerous to me or my family? And will these meters be upgraded to 5g? | Granted | 11/08/2020 | FOI10268 |
16/07/2020 | Journalist | Preliminary assessments of sites where fluid is leaking from ESB cables in Dublin. | Refused | 06/08/2020 | FOI10267 |
15/07/2020 | Business/Interest Group | A map of electricity substations in Ireland (for the assessment of site viability), and in particular counties Donegal and Sligo. The map would need to be quite detailed in order to identify the site precisely (if possible). Pdf would be preferable format if possible. | Handled outside of FOI | 29/07/2020 | FOI10266 |
07/07/2020 | Client | All Emails, memos, notes, minutes and other documents and communication relating to any request to connect ESB or move poles at Rosshill, Roscam, Galway. Including but not limited to any request or communication from Mad Yoke Farm Ltd, Seafront Farm Ltd, Sunmile Ltd, their agents or others acting on their behalf for the period 01/01/2018 to the present day. | Part-Granted | 21/07/2020 | FOI10265 |
06/07/2020 | Client | All Emails, memos, notes, minutes and other documents and communication relating to any request to connect or move poles at Ros Odhrain Rosshill Road Roscam (See attached). Including but not limited to any request or communication from Proofridge limited, Grayback limited their agents or others acting on their behalf for the period 01/01/2019 to the present day. | Part-Granted | 21/07/2020 | FOI10264 |
16/06/2020 | Business/Interest Group | • 2018 Summer Valley and Winter Peak Demand in MW’s associated with each 38kV and 110kV substation in the Republic of Ireland • 2019 Summer Valley and Winter Peak Demand in MW’s associated with each 38kV and 110kV substation in the Republic of Ireland. • confirm what 110kV substations back-fed generator connections when the 110kV substations that normally feed the generators are unable to do so. | Part-Granted | 08/07/2020 | FOI10263 |
04/06/2020 | Client | Confirmation of any damage complaint received by ESB Networks Limited from the Charlestown area of Co. Mayo over the last 5 years. Confirmation of the substance of the complaint e.g. damage by ESB Networks, or contractors on their behalf , damage to what if applicable, when and how, and the outcome of the complaint. No personal details required, please redact if any personal details to allow issue. | Refused | 30/06/2020 | FOI10261 |
17/04/2020 | Client | 1. All records relating to any agreement or arrangements between ESB networks and the owners, operators or authors of “brand new retro” book and/or website and “totally Dublin” website. 2. All records including permissions/ limitations/ remuneration relating to usage of ESB networks facilities, including digital scanning facilities, and the “brand new retro” website and the “totally Dublin” website. 3. All records in relation to agreements between ESB networks and the “brand new retro” website and/or book and the “totally Dublin” website including about hosting and/or usage of images and printed material belonging to ESB networks or its corporate antecedents. 4. All records in relation to permissions granted to non ESB networks personnel to access ESB networks systems premises, and/or infrastructure and/or data held in its heritage and archive facilities. 5. All records including permissions relating to the work (during office hours or otherwise) of ESB networks personnel on projects relating to “the brand new retro” and “totally Dublin” websites and publications. | Refused | 22/04/2020 | FOI10259 |
19/03/2020 | Journalist | Any reports and internal correspondence on the potential impact on the Gearagh as a result of proposed flood relief works on the Lower Lee in Cork, Jan 1 2015 to the date of this request. | Refused | 31/03/2020 | FOI10258 |
08/03/2020 | Client | Details of the salary grades used for staff employed in Health & Safety Management roles. | Refused | 03/04/2020 | FOI10257 |
08/03/2020 | Journalist | The details of all complaints made by residents of Longford, Leitrim and Roscommon, in tabular form, to ESB Networks between August 1st 2019 and February 29th 2020. Also, The actions taken by the ESB after complaints made by residents in Longford, Leitrim and Roscommon, in tabular form, between August 1st 2019 and February 29th 2020. | Part-Granted | 26/03/2020 | FOI10256 |
19/02/2020 | Client | Fault records for the location Fairview station (Cadogan Rd/Addison Rd) between 24. January 2019 and 20. February 2020. The number of outages for the Cadogan Rd/Addison Rd area. Including dates and duration of the outages. | Granted | 11/03/2020 | FOI10254 |
14/02/2020 | Journalist | All minutes of board meetings held during 2019 . If you do not have a board, the board-equivalent body will suffice, ie, governing authority, management committee, etc. | Part-Granted | 12/03/2020 | FOI10253 |
13/02/2020 | Client | 1. Any record* which shows (or can be used to calculate) the average number of unplanned service interruptions experienced by each customer, based on unplanned outages / interruptions experienced by all customers (residential and commercial) on an annual basis for each of the years 2017, 2018 and 2019 to date. 2. Any record* which provides an analysis of unplanned service interruptions / outages on a geographical basis in each of the years 2017, 2018 and 2019 to date. 3. Any record* which shows the ‘best’ and ‘worst’ performing areas or transmission districts in terms of unplanned service outages / interruptions in each of the years 2017, 2018 and 2019 to date. 4. Any record* which shows information on dates, times and durations of unplanned outages / interruptions experienced in 2017, 2018 and 2019 to date by customers served by the transformer located at Burnaby Mill, Greystones, including outages which were not due to any issue at that transformer.5. Any record* which shows or analyses the frequency of outages, nationally, or in North Wicklow, over any comparative periods (e.g. the 5 years ending 31/12/2019 compared to the five years ending 31/12/2014) current data, and data for the years since 2012 6. Any record* which provides an analysis of future proofing of capacity of the transmission network supplying the Wicklow area generally, Greystones, and Burnaby Mill in particular. 7. Any record* which provides an analysis of predicted future national demand for electricity, with particular emphasis on residential demand arising from increased use of electric vehicles. 8. Any record* which provides an overview of the capacity of the existing national transmission network to satisfy anticipated future demand for electricity. 9. Any record* which provides an overview of the capacity of the existing transmission network in, or supplying, Greystones, County Wicklow, to satisfy anticipated future demand for electricity. 10. Any record* which provides an overview or detailed analysis of the capacity of existing residential connections to support likely future demand for electricity in residential units (houses, apartments or other types of residence) with standard single phase 220V supply and where more than one electric vehicle is to be charged each night. 11. Any record* which analyses the capacity of the transformer at Burnaby Mill, Greystones, to handle current and likely future consumer demand for electricity. 12. The most recent ESB Networks Key Statistics documents (the search function on your website delivers a 2014 document) *In requesting ‘any record’ , not all records – I’m interested only in obtaining representative sample of records which provide a ‘rough picture’ of the situation. | Part-Granted | 11/03/2020 | FOI10252 |
06/02/2020 | Client | Information on Salmon returns to the River Erne. Fish counter data for the annual return of salmon to Cathaleen’s Falls and Cliff Hydroelectric dams. The number of adult salmon retained by ESB for smolt ranching. The number of adult salmon allowed to escape upstream of Cliff dam to naturally reproduce. The number of smolts, fry and ova released by the hatchery. Provide the above data for the last 10 years in excel and graphical form. | Refused | 21/02/2020 | FOI10251 |
22/01/2020 | Client | Non Personal information relating to communication between the directors, agents or representatives of Kegata Limited, First Floor, Fairgreen House, Fairgreen Road, Galway, H91 AXK8 regarding the proposed strategic housing development Rosshill Manor (see www.rosshillmanorshd.ie) and ESB networks regarding requests for consultations, connection or other enagagment by ESB networks in support of the proposed development. | Part-Granted | 17/02/2020 | FOI10247 |
07/01/2020 | Journalist | Access to records of expenditure on the Electric Ireland advertising campaign featuring Colonel Chris Hadfield. | Refused | 13/01/2020 | FOI10246 |