Connect a Community-led Renewable Energy Project
On 01 July 2021, the Commission for Regulation of Utilities (CRU) published a Clarification Note (CRU/21/069) to change the definition of a Community-Led Renewable Energy Project contained in the Enduring Connection Policy Stage 2 (ECP-2) Decision Paper (CRU/20/060). Community-led Energy Projects must be 100% community-owned to be processed under Category C in ECP-2.5, and subsequent ECP batches. The revised definition aligns with the RESS-2 Community-Led Project ownership requirements of 100% (as outlined in the RESS-2 Terms & Conditions).
Community-led Projects must also have a Maximum Export Capacity (MEC) greater than or equal to 0.5 MW and less than or equal to 5 MW and meet the following requirements:
- At all relevant times, be at least 100% owned by a Renewable Energy Community (the “Relevant REC”) either by way of direct ownership of the ECP project’s assets or direct ownership of the shares in the generator; and
- At all relevant times, at least 100% of all expected profits, dividends, and surpluses derived from the project are returned to the Relevant REC.
On 25th September 2024, the CRU published its decision on Electricity Connection Policy – Generation and System Services (ECP-GSS), which sets policy for onshore renewable and conventional generators, storage, and other system services technology projects connecting to the electricity system. The System Operators (SOs) are working with the CRU on the actions outlined in this decision paper. For further information, please refer to the Electricity Connection Policy – Generation and System Services Decision Paper (CRU/2024101).
Generator Types:
- Wind turbines (wind)
- Solar photovoltaic panels (solar)
- Hydraulic turbines (hydro) excluding pumped storage
- Waste to energy projects
- Biomass projects and biogas projects
Note: Renewable energy generation technologies may not be used in combination with non-renewable generation technologies.
Step by step guide
Useful Information
Useful Publications
2022 Batch (ECP-2.3) Results - Category B & C
Community-led Renewable Energy Projects Guide
ECP-2 Declaration of Community Led Energy Project Form
Ruleset for Enduring Connection Policy Stage 2 (ECP-2)
2022 Batch (ECP-2.3) Results - Category B & C
2022 Batch (ECP-2.3) Results - Category B & C
Community-led Renewable Energy Projects Guide
Community-led Renewable Energy Projects Guide
ECP-2 Declaration of Community Led Energy Project Form
ECP-2 Declaration of Community Led Energy Project Form
Ruleset for Enduring Connection Policy Stage 2 (ECP-2)
For connections made after September 2018, some Distribution Code conditions may change, arising from the need to be aligned with European Network Codes.