What is the National Network, Local Connections Programme all about?
The Programme was set up to help strengthen Ireland’s ability to meet climate action targets by delivering a cleaner electric future for all.
We understand the importance of removing carbon from of our society and to do this, fundamental changes are required to take place in the energy industry in terms of how Ireland generates, stores and consumes electricity daily.
By 2030, our aim is to support all electricity customers in managing their own energy use through products, services and experiences that allow them to take full advantage of flexible demand and make active choices in their own use of electricity.
Learn more about flexibility here.
What is a Family Apartment?
A family apartment (previously referred to as a granny flat) is a self-contained unit built adjoining an existing house. It is used for additional accommodation for a family member, usually an elderly person. A family apartment may be a newly constructed extension or a conversion of an existing structure such as a garage.
Family Apartment Conditions
There are certain conditions that must be met to qualify for a family apartment connection:
- As a sub-division of a main dwelling, the meter for a family apartment must be connected to the same incoming ESB Networks service cable as the main dwelling. The family apartment meter must therefore be located immediately adjacent to the meter for the main dwelling. Prior to the customer carrying out any works, the suitability of the service and proposed position of the meter must first be agreed with ESB Networks.
- Only one family apartment connection is allowed per dwelling at ground floor level.
- The apartment must be for family use only, not for sub-letting.
- Proof of planning permission for the family apartment from the relevant Local Authority may be requested. Where planning permission is not required, ESB Networks may require evidence of family use.
- The main dwelling and family apartment should be internally connected through an interconnecting door.
- The existing service must be adequate to cater for the main dwelling load as well as the proposed family apartment.
Where any of the criteria above are not met, the new connection may be dealt with as a standard 12 kVA house or apartment development.