Publications
All Publications
559 KB
Distribution System Operator DSO Load Shedding Plan |Download PDF 563 KB
Aligned with the distribution code, ESB Networks has published its demand control plan entitled ‘Distribution System Operator Load Shedding Plan’ following approval from the Commission for the Regulation of Utilities. The plan enables ESB Networks, following such an instruction from EirGrid, to implement a reduction in electricity demand in a safe and controlled manner.
1 MB
Distribution System Operator (DSO) Licence
This document lists the conditions with which ESB Networks DAC. must comply in order to discharge its functions as Distribution System Operator (DSO).
1 MB
Distribution System Security and Planning Standards
New Distribution System Security and Planning Standards
As part of the ESB Networks’ Innovation Strategy, under the Smarter HV and MV Customer Connections Innovation Project, the Distribution System Security and Planning Standards were reviewed to establish how the standards needed to evolve to meet the changes in the electricity industry taking account of the requirements of binding National and EU Energy Directives and Network Codes, whilst cost effectively maintaining a safe, secure and reliable distribution system.
These Standards are effectively the rules by which we connect our customers to the electricity distribution network. The new rules were developed during the innovation project with significant collaboration and consultation with stakeholders.
Among the updated standards, there are new standards which will help facilitate more renewable energy on our network with the introduction of non-firm access for distributed generators and flexible solutions on our network with the introduction of non-wires alternative solutions; both of which will be implemented in a phased manner over time. This is outlined in the foreword section of the Distribution System Security and Planning Standards and the roadmaps in the Non-Firm Access for Distributed Generators Guide and the Non-Wires Alternatives to Network Development Guide.
The new Standards and Guides have recently been approved by the CRU and are available to view by following the links below.
Non-Wires Alternatives to Network Development Guide | PDF | 666 KB
Non-Firm Access for Distribution Connected Distributed Generators Guide | PDF | 478 KB
109 KB
DSO Capacity Release Form
On the 10th June 2020, the Commission for Regulation of Utilities (CRU) published a Decision Paper - Enduring Connection Policy Stage 2 (ECP-2) CRU/20/060 (the “CRU Decision Paper”), following a CRU Consultation - Enduring Connection Policy Stage 2 (ECP-2) - Proposed Decision CRU/19/143.
As directed by the CRU, this standard application form has been published to facilitate the implementation of Section 2.9 of the CRU Decision Paper. This application form should not be used for any other purpose.