Publications
All Publications
6 MB
Safe Construction with Electricity new
248 KB
Safety Competition Top Tips for creating your poster
Safety Competition Top Tips for Creating your Poster.
382 KB
Safety Co-ordination (DOC 11) - Modification No. 38
Modification No 38 Safety Procedures
Effective Date 23/02/2016
263 KB
Safety Procedures - Modification No. 39
Modification No. 39 - Safety Procedures
Effective Date 23/02/2016
1 MB
SEMC consultation 2106 System Services Future Arrangements HLD - ESB Networks response 21.10.2021
Download PDF338 KB
Senior Level Lesson 3
Understand the concept of electrical conductors and insulators.
341 KB
Senior Level Lesson 4
Identify how to stay safe with electricity in the local environment.
629 KB
servo-innovation-project-close-out-report
The SERVO (System-wide Energy Resource and Voltage Optimisation) project was delivered in collaboration with the Telecommunications Software and Systems Group (TSSG) at Waterford Institute of Technology (WIT). This report details delivery of the SERVO Live & Flex modules, in support of the Dingle Electrification Project, which had two aims: To develop the technical infrastructure to enable secure collection, storage and reporting of data collected from IOT devices deployed on the electricity network; to develop a secure application programme interface (API) to securely enable access to this IOT data set held within the Microsoft Azure Cloud database.