Publications
All Publications
304 KB
Functional Specification 18150 for the Installation of Ducts and Ancillary Structures for 38KV Underground Power Cables and Associated Communication Cables for Contestable Projects
Download PDF848 KB
Functional Specification 18151 for the Installation of 38KV Underground Power Cables for Contestable Projects
Download PDF837 KB
Functional Specification 18153 for the Installation of 20KV UG Power Cables for Contestable Projects
Download PDF169 KB
Gate 2 Connection Offers - Timeline and Direction
This document sets out the timeline and the process for roll-out of offers to Gate 2 Groups.
44 KB
Gate_3 _Project_Plan_May_2011
This document outlines the high level summary of the System Operators Gate 3 Project Plan. This revision reflects the impact of the introduction of Distribution contestability on the Plan, and records when PGOR (Possible Generator Output reports) will be available for issue. It also provides the expected date when Final Constraint Reports will be available.
631 KB
General Conditions for Connection of Industrial and Commercial Customers and Generators to the Distribution System
This document sets out the conditions for connecting a premises to the electricity distribution system for loads greater than or equal to 100 Kilovolt Amps (kVA).
529 KB
General Specification Document 18134 for Contestable Built MV Substations Equipped with Embedded Generation Interface Protection (EGIP)
Download PDF326 KB
General Specification for Business Low Voltage (LV) Underground Service
This document outlines the general specification for business low voltage (LV) underground service.
40 KB
Generator Connections - Complaints Procedure
This document outlines the procedure you need to take if you have a complaint about your Connection Offer or other aspects of your Generation connection to the Distribution System.
306 KB
Generator Developers Information Pack
This document is issued by ESB Networks as a guide to Developers of generation projects to give an understanding of the connection process for both Non-Contestable and Contestable Generator projects.