No.1 Special Load Report Section 1 2016-17 Front Pages
Special Load Reading Data
Special Load Reading data for 2016-2017 providing demand information on transformers and feeders of 110kV and 38kV substations. These records have been redacted removing customer names, MPRN, MIC, billing class and MEC.
Abnormal Feeding | PDF | 32 KB
HV Export Customer Stations | PDF | 44KB
HV Demand Customer Stations | PDF | 46KB
MV & LV Generators < 25kVA | PDF | 81KB
244 KB
Node Assignments list - Updated 20_05_2011
The System Operators have undertaken to update the node assignments list from time to time to confirm any changes to the Gate 3 tables originally published on the 19th January 2009. Changes are marked in yellow in the document and a footnote is included explaining the high level reason for the change.
493 KB
Non-Firm Access for Distribution Connected Distributed Generators Guide
This is a guide document outlining the introduction and development of Non-Firm Access (NFA) for connection of distributed generators to the distribution system which will be implemented in a phased manner over time, and as indicatively set out in the roadmap in the document.
This is a supporting guide document to the Distribution System Security and Planning Standards.
680 KB
Non-Wires Alternatives to Network Development Guide
This is a guide document outlining the introduction and development of Non-Wires Alternative (NWA) options to conventional network development which will be implemented in a phased manner over time, and as indicatively set out in the roadmap in the document.
This is a supporting guide document to the Distribution System Security and Planning Standards.
133 KB
Novation Request Template Letter
In the case of requests for Assignment, you should submit the Letter of Assignment/ Novation requesting to novate the existing Connection Agreement to a New Legal Entity.
194 KB
Pay As You Go Meter
This document will provide you with all the relevant information you need to know about your pay as you go meter.
3 MB
Proposal for General Application of RfG Requirements for Ireland
The consultation on the non-exhaustive parameters for the Requirements for Generators [RfG] has now closed. This proposal document is produced jointly by EirGrid plc in its role as the Transmission System Operator in Ireland and ESB Networks in their role as the Distribution System Operator in Ireland. This document contains the proposed parameters and explanations as to the reasons for their adoption, which are now formally submitted to the Commission for Regulation of Utilities [CRU] for approval. It also contains responses to the consultations and the System Operator replies.