Publications

All Publications

418 KB

No.1 Special Load Report Section 1 2016-17 Front Pages

Special Load Reading Data

Special Load Reading data for 2016-2017 providing demand information on transformers and feeders of 110kV and 38kV substations.  These records have been redacted removing customer names, MPRN, MIC, billing class and MEC.

SLR Main Section | PDF | 1MB

Abnormal Feeding | PDF | 32 KB

HV Export Customer Stations | PDF | 44KB

HV Demand Customer Stations | PDF | 46KB

MV & LV Generators < 25kVA | PDF | 81KB 

 

Download PDF

244 KB

Node Assignments list - Updated 20_05_2011

The System Operators have undertaken to update the node assignments list from time to time to confirm any changes to the Gate 3 tables originally published on the 19th January 2009. Changes are marked in yellow in the document and a footnote is included explaining the high level reason for the change.

Download PDF

493 KB

Non-Firm Access for Distribution Connected Distributed Generators Guide

This is a guide document outlining the introduction and development of Non-Firm Access (NFA) for connection of distributed generators to the distribution system which will be implemented in a phased manner over time, and as indicatively set out in the roadmap in the document. 

This is a supporting guide document to the Distribution System Security and Planning Standards.

Download PDF

680 KB

Non-Wires Alternatives to Network Development Guide

This is a guide document outlining the introduction and development of Non-Wires Alternative (NWA) options to conventional network development which will be implemented in a phased manner over time, and as indicatively set out in the roadmap in the document. 

This is a supporting guide document to the Distribution System Security and Planning Standards.

Download PDF

133 KB

Novation Request Template Letter

In the case of requests for Assignment, you should submit the Letter of Assignment/ Novation requesting to novate the existing Connection Agreement to a New Legal Entity.

Download PDF

166 KB

Pathways to Engagement

Download PDF

194 KB

Pay As You Go Meter

This document will provide you with all the relevant information you need to know about your pay as you go meter.

Download PDF

617 KB

Planning Drawing for MV EGIP Modular Substation BUILDING DOC-040822-HMT

Download PDF

717 KB

Planning Drawing for MV EGIP Modular Substation FOUNDATION DOC-040822-HMU

Download PDF

751 KB

PR5 TSO DSO Joint Incentive Multi-Year Plans 2025-2029 Consultation Paper

Download PDF

855 KB

Proposal for General Application of DCC Requirements for Ireland

Download PDF

3 MB

Proposal for General Application of RfG Requirements for Ireland

The consultation on the non-exhaustive parameters for the Requirements for Generators [RfG] has now closed. This proposal document is produced jointly by EirGrid plc in its role as the Transmission System Operator in Ireland and ESB Networks in their role as the Distribution System Operator in Ireland. This document contains the proposed parameters and explanations as to the reasons for their adoption, which are now formally submitted to the Commission for Regulation of Utilities [CRU] for approval.  It also contains responses to the consultations and the System Operator replies. 

Download PDF
39 / 46
1
. . .
37 38 39 40 41
. . .
46